PROJECTS COMPLETED
• 25 000 meter air-flush core contract for Nucoal Mining Limited. Mpumalanga, South Africa.
Resident Geologist: Dr Digby Gold.
• 3 000 meter air-flush core contract for Wescoal Mining Limited. Witbank, South Africa.
Managing Director: Mr. Andre Bojè.
• Contract for Central African Mining [CAMEC] Plc. Tete, Mozambique.
6 500 meters drilled in 3 months. This was a deep hole (350m and beyond) coal exploration project.
Senior Geologist and Project Manager: Mr. Allan Saad.
• Gold exploration for African Queen Mining, Canada. Manica, Mozambique.
Chief Geologist and Project Manager: Mr. Peter Siegfried.
• Coal Exploration for Transasia Mineral Corporation. Mpumalanga, South Africa.
Project Geologist: Mr. Alan Golding.
• Various small exploration projects. Limpopo, South Africa.
Consulting Geologist: Mr. Marcel Dippenaar.
• Water Monitoring Pietzometer holes for Shell and BP owned service stations. KwaZulu-Natal, South Africa.
Consulting Geologist: Geomeasure Group, Mr. Rupert Sabire.
• Cementitious Limestone diamond drilling for Multi Metals Group, central Mozambique.
Consulting Geologist: Applied Geology and Mining, Mr. David Grant.
• Drilling, test pumping and pump installation of 150 water wells for the DWAF Emergency Schools water program. KwaZulu-Natal, South Africa.
Administrator: Umgeni Water, Mr. Bongumusa Mtshali.
• Gold exploration project for Galaxy Gold Mining Ltd. Barberton, South Africa. Over 16 000m NQ surface drilling including angle drilling to 55°, as well as multiple holes drilled using non-directional wedges. 4 000m of underground drilling and the formation of a 24/7 team of underground drillers. This was a two-year contract.
Galaxy Gold Geologist: Mr. Dale Richards.
• Coal Exploration project for Somkhele Mine, Umfolozi District, KwaZulu-Natal, South Africa.
Consulting Geologist: Applied Geology and Mining, Mr. David Grant.
• Oct 2013 to July 2014: Iron Ore dump evaluation project, Reverse Circulation and Diamond Core over 4 000m of each for Salgoacar (Pty) Ltd, Ngwenya Mine, Swaziland.
Administrator: Mr. S Prasad.
• 2014/15: Core drilling contract for Gold One. Gauteng and Free State, South Africa.
Gold One Geologist: Dale Richards.
• Over 3 000 small diameter wells sunk for the United Nations. Mozambique and Malawi. This was an extensive project drilling for refugees during the war years in Mozambique.
• High-yield, large diameter mud-rotary drilling for Town and City supplies, Mozambique (Quelimane, Pemba and Maputo).
• Large diameter mud rotary wells drilled aimed at irrigation works for Coastal Cashews. Makathini Flats, KwaZulu-Natal, South Africa. A similar contract was also completed in Xinavane, Mozambique.
• Reverse Circulation drilling for heavy minerals projects for Severin Mining and later Rio Tinto. Richards Bay and Mtunzini, KwaZulu-Natal, South Africa.
• Water well drilling for the Zululand District Municipality, Northern KwaZulu-Natal, South Africa.
Consulting Hydrologist: Sylvester Ndoora SCN Consulting.